Material invoice checks for multi-site contractors

The load was short. The invoice wasn't.

We build the system that checks each supplier invoice against the delivery notes your sites signed and the prices you agreed, line by line, before it is paid.

See it check an invoice

Every line, against its ticket.

Signed on site

Delivery tickets
  • 884211Mon 02 Mar · Site 12 8.0 m3 C25/30 · 07:20 to 07:45, 25 min on site
  • 884212Mon 02 Mar · Site 12 8.0 m3 C25/30 · 07:50 to 08:40, 50 min on site
  • 884213Mon 02 Mar · Site 12 3.5 m3 C25/30 · 09:10 to 09:35, 25 min on site
  • 885004Wed 04 Mar · Site 07 6.0 m3 C35/45 pump mix · 10:00 to 10:30, 30 min on site
  • 885009Wed 04 Mar · Site 07 6.0 m3 C35/45 pump mix · 10:35 to 11:03, 28 min on site
  • Site 12 Riverside block A, foundation slab
  • Site 07 Depot extension, level 2 columns

Agreed prices, 2026

Kestrel Readymix

Per unit shown, excluding VAT.

  • Concrete C25/30 per m3 112.00
  • Concrete C35/45 per m3 129.00
  • Pumpable mix supplement per m3 2.50
  • Part load requested, per m3 under 6.0 m3 per m3 7.50
  • Waiting time, after the first 30 minutes on site per full 15 minutes 14.00

Supplier invoice, checked

Example data
Supplier
Kestrel Readymix
Invoice
INV-0318
Date
Fri 06 Mar 2026
Invoice total
4,638.75

Billed to Tarnwick Contracting. Amounts in EUR, excluding VAT.

Description, ticket Delivery address Quantity Price Amount Check
C25/30 884211 Agrees Site 12 8.0 m3 at 112.00 896.00
C25/30 884212 Agrees Site 12 8.0 m3 at 112.00 896.00
Waiting time 884212 Site 12 1 x 15 min at 14.00 14.00 Agrees 50 minutes on site, 20 over the free 30: one full 15 minutes
C25/30 884213 Site 12 4.0 m3 at 112.00 448.00 Billed 4.0 m3, ticket says 3.5 m3: 0.5 m3 above to the site manager, Site 12
Part load 884213 Site 12 2.5 m3 under at 7.50 18.75 Agrees 3.5 m3 is 2.5 m3 under 6.0 m3
C35/45 885004 Agrees Site 07 6.0 m3 at 129.00 774.00
Pumpable mix supplement 885004 Site 07 6.0 m3 at 2.50 15.00 Agrees The ticket is for a pump mix
C35/45 885004 Site 07 6.0 m3 at 129.00 774.00 Ticket 885004 is already billed on line 6 to the accounts clerk: ask the supplier for a credit note
C35/45 885009 Agrees Site 07 6.0 m3 at 129.00 774.00
Waiting time 885009 Site 07 1 x 15 min at 14.00 14.00 28 minutes on site, inside the free 30 to the buyer
Pumpable mix supplement 885009 Site 07 6.0 m3 at 2.50 15.00 Agrees The ticket is for a pump mix

8 of 11 lines agree. 3,402.75 is ready for the cost of two sites. 3 lines wait for a person: 1,236.00.

  • Site 12 · code 210 Structural concrete 1,824.75
  • Site 07 · code 210 Structural concrete 1,578.00
  • Waiting for a person: 1,236.00

Ready-mix concrete. 8 of 11 lines agree. 3,402.75 is ready for the cost of two sites. 3 lines wait for a person: 1,236.00. For the site manager, Site 12: line 4. For the accounts clerk: line 8. For the buyer: line 10.

Your rules. Flip one and watch the invoice.

The price differs from the agreed one

Every price on this invoice is the agreed one.

The invoice bills more than was delivered
A charge the ticket does not back up
Everything agrees

In this sketch a ticket billed twice, and a ticket signed for another site, always wait for a person. In the real system these are rules too, set with you.

The real system gets more checks, chosen with you from the data your accounting system holds: tolerances, a closed site, a supplier on hold, a delivery outside the agreed period, approval by amount, and whether an invoice with a held line is paid in part or waits whole. Each goes to the person you name.

This sketch runs on fixed example documents and simple rules. The real system reads your own delivery notes and invoices with a language model and checks each line it can read against your price agreements. Every company, document and price here is invented.

Your numbers

What checking by hand costs today.

400
3
35
400,000

Example values. Enter yours.

240 hours a year

0.1 full-time people

€8,400 a year

€4,000 a month is one percent of your material spend

How this is counted

400 delivery notes × 3 minutes ÷ 60 × 12 months = 240 hours. Divided by 1,700 hours a year, that is 0.1 people. At €35 an hour, €8,400. One percent of €400,000 is €4,000.

Not counted: what was billed above what arrived and paid anyway. We found no independent figure for how often that happens, and a vendor's figure is not yours. One percent of your spend is shown only so you can judge the size.

We promise no saving. The first version is measured on your own invoices, and you see the result before you decide on more.

Buy or build

When a product is the better choice.

Buy a ready-made product if

  • You build in Germany, Austria or Switzerland on one of the common construction systems, and your suppliers can send digital delivery notes.
  • You are a large general contractor whose framework agreements and bills of quantities already live in one system.
  • Your construction software already has a delivery note app or goods receiving built in. Use that first.

Talk to us if

  • Your delivery notes are your suppliers' own PDFs and paper, and your accounting system is on nobody's integration list.
  • Your price agreements and your site rules are your own, and a product would bend them to fit its model.
  • You want a fixed price for a first version, measured on your own invoices, and the code in your hands.

And if you check only a handful of invoices a month, a spreadsheet and one careful person will serve you better than either.

How we start

One supplier. One system. Measured on your invoices.

  1. First

    A free 30-minute call

    Bring one supplier's invoice from last month and its delivery notes. We go through them with you, on your screen.

  2. Then

    A fixed price

    For a first version on one kind of material and one accounting system, once we have looked at a sample of your invoices and delivery notes.

  3. Build

    Reading, checking, a review screen

    Lines that agree with the delivery note and your price are ready for the cost of the right site. Your team reviews what the system holds.

  4. Side by side

    It runs next to your team

    We count, out of 100 invoice lines: how many passed untouched, how many were held for a person, how many were wrong.

  5. After

    You decide

    More suppliers, more materials, more sites. Or stop. You have paid for the first version only, and the code is yours.

From you: sample invoices with their delivery notes, your price agreements, your site and cost code lists, a test copy of your accounting system, and some time from the people who know your suppliers. Scans and photos are harder to read than PDFs, so we test yours before we promise anything. No test copy? We start from an export and connect later.

FAQ

Common questions.

Bring one invoice your team argued about.

A free 30-minute call. We go through it against its delivery notes with you and tell you what a system would have caught, and what it would not.