Mill certificates for steel and metal distributors
The steel is in stock. The paper is somewhere.
We build the system that reads each certificate, checks it against the delivery and the order, lists what is missing, and keeps the proof beside your ERP.
See it check a delivery
Every certificate, against its steel.
Hot rolled plate, S355J2+N, EN 10025-2, 20 x 2000 x 6000 mm
Nordhaven Plate Mill heat 2611457 4 plates, 7,612 kg net
Chemistry, mechanical tests and signature: present
Hot rolled plate, S355J2+N, EN 10025-2, 30 x 2000 x 6000 mm
Nordhaven Plate Mill heat 2611462 2 plates, 5,701 kg net
Chemistry, mechanical tests and signature: present
Checked against the order
Example data- Order
- PO 45-2291
- Supplier
- Nordhaven Plate Mill
- Delivery note
- DN 88120, 18 Sep 2026
- Certificates required
- 3.1 for lines 1 and 2, 3.2 for line 3
Filed: 7,612 kg. Waiting on the sender: 4,758 kg. Held for a person: 5,701 kg.
Plate from the mill. Filed: 7,612 kg. Waiting on the sender: 4,758 kg. Held for a person: 5,701 kg. Line 2 waits on the sender. Line 3 goes to the quality manager.
Your rules. Flip one and watch the lines.
The system compares what the documents say. It cannot look at the steel, and it cannot tell whether a certificate is genuine. Those stay with your people.
The real system gets more checks, chosen with you from the data your ERP holds: required test values present, a second certificate for the same heat, a heat already sold. What a certificate must say to count is set with your quality manager, from the standards you hold. We do not ship a standards library.
This sketch uses simple rules on invented documents in clean text. Real certificates differ by mill and by language, and many arrive as scans: the real system reads them with a language model, and we test yours before we promise anything. Every company, order and certificate here is invented.
Your numbers
What the paperwork costs today.
Example values. Enter yours.
1,200 hours a year
0.7 full-time people
€42,000 a year
How this is counted
800 lines × 6 minutes ÷ 60 = 80 hours a month, plus 20 hours producing certificates for customers and auditors = 100 hours a month. × 12 = 1,200 hours a year. Divided by 1,700 hours a year, that is 0.7 people. At €35 an hour, €42,000.
Not counted: goods held back for want of paper, customer claims and rejected lots. They are real, they differ for every firm, and we will not guess them.
We promise no saving. The first version is measured on your own certificates, and you see the result before you decide on more.
Bring five deliveries to a 30-minute callBuy or build
When a product is the better choice.
Buy a ready-made product if
- CBAM is your only obligation. A ready-made product can cost less than a build, and its maker takes on the rule changes.
- You need origin declarations from many suppliers under many trade agreements. Specialist products carry the templates and the reminders.
- Your ERP already reads the certificate and compares heat number, grade and type with the delivery line. Then you do not need us.
Talk to us if
- Certificates arrive by email as PDFs, in every mill's own layout, and the check against the delivery is still done by eye.
- A customer or an auditor asks which certificate covers which steel, and the answer means opening folders.
- You want a fixed price for a first version, measured on your own certificates, and the code in your repositories.
We are software engineers. We are not a customs broker, a verifier or a carbon calculator.
How we start
One mailbox. One ERP. Measured on your certificates.
-
First
A free 30-minute call
Bring five real deliveries with their certificates, good and bad. We go through them with you.
-
Then
A fixed price
For a first version on one mailbox and one ERP, once we have looked at a sample of your certificates.
-
Build
Reading, matching, a review screen
Certificates that match are filed against the delivery line, with a record of what was checked. Your team reviews what the system holds before it counts.
-
Side by side
It runs next to your team
We count, out of 100 certificates: how many were filed untouched, how many were held for a person, how many were wrong.
-
After
You decide
More mailboxes, more suppliers, certificates put together per customer order. Or stop. You have paid for the first version only, and the code is yours.
From you: sample certificates and the deliveries they belong to, your orders and delivery notes as an export or a test copy of your ERP, a word on who decides what, and some time from your quality person and whoever books goods in. Scans are harder to read than PDFs with text, so we test yours before we promise anything. No test copy? We start from an export and connect later.
Closest work
What we have built that is close.
Plainly: checking mill certificates against deliveries would be new for us, and so would the steel trade. That is why the first version is measured on your certificates.
Arhivix
Our own document system. AI reads each file, recognizes the type, supplier and dates, and routes it to the right people.
500+
companies run their documents through it
Read about ArhivixFENIX TEAM PLAST
AI quoting for a windows and doors maker. A site measurement becomes a quote, then production data, wired into the ERP and CRM they already had.
From 3 days to same day
Time to produce a quote
Read the FENIX case studyYou own the code, in your repositories. No lock-in, and no licensing per user.
FAQ
Common questions.
Bring five deliveries and their certificates.
A free 30-minute call. The ones that matched and the ones that did not. We go through them with you, on your screen.