Breakdown work orders for industrial plants

The line stopped. Do we have the part?

We build the system that reads the first message about a fault and drafts the work order: which machine, which parts, and what your stock list says.

See it draft a work order

From a message to a work order.

All three tabs start from the same storeroom and the same pumps. Each tab is a separate morning.

As it arrived Message
From
Line 2 shift leader
Time
06:12
water pump at line 2 is loud and leaking, drip about 1 per second, motor warm. can we stop it?
What the plant already holds

Pumps

  • PMP-04 Process water pump, Line 2, filler, type P-65
  • PMP-06 Process water pump, Line 2, rinser, type P-65

Storeroom

  • 100517 Mechanical seal kit, pump type P-65 Bin C-02-11, on hand 2
  • 100233 O-ring set, pump casing Bin C-02-12, on hand 3

Past orders

  • Seal leak on a type P-65 pump: the last three orders each used kit 100517 and O-ring set 100233.

Draft work order

Example data
FieldDraftCheck
Machine PMP-04 or PMP-06? "water pump at line 2" fits two pumps to the line 2 shift leader
Fault Seal leakAlso noted, not coded: loud, motor warm Matched: leaking, drip
Question Can we stop it? A question about stopping a running machine to the maintenance lead

Parts

Part Qty Price Check
100517Mechanical seal kit, pump type P-65 1 set €186.00 On hand: 2, bin C-02-11 The same item fits both pumps
100233O-ring set, pump casing 1 set €12.80 On hand: 3, bin C-02-12

No bearing is added: "loud" is noted, and a bearing goes on the order only if the technician reports play.

3 lines ready. 2 wait: the shift leader and the maintenance lead.

Parts on the draft: €198.80.

Whether to stop a running machine, and anything about safety, always goes to a person. It is not a rule you can flip.

A shift message. 3 lines ready. 2 wait: the shift leader and the maintenance lead.

Your rules. Flip one and watch the draft.

The message could mean either of two pumps
A part is out of stock

Every part here is in stock.

A part named fits two stock items

No part here fits two items.

The closing note gives no cause

This is not a closing note.

The real system gets more checks, chosen with you from the data you hold: a part that belongs to a different pump type, a part below its reorder level, the same fault on the same machine within a few weeks. Each goes to the person you name.

This sketch uses simple rules on invented records. The real system uses a language model and checks every line against your machines, your parts list, your stock and your past orders. It starts where the words are typed: a request form, an email, a note. Every name and number here is invented.

Your numbers

What the first minutes cost.

8
45
€1,500

Example values. Enter yours.

72 hours a year standing before the repair starts

€108,000 a year, at your cost of a standing hour

How this is counted

8 breakdowns a month x 45 minutes, divided by 60, x 12 months = 72 hours. 72 hours x 1,500 euros = 108,000 euros.

Not counted: the repair itself, the parts, scrap and restart, repeat failures and overtime. If a standby machine takes over, your hour costs less: enter that.

We promise no saving. A complete order can only shorten the part of the wait that comes from missing information, and we do not know how much of yours that is until we look at your own breakdowns.

Buy or build

When a product is the better choice.

Buy a ready-made product if

  • You run on paper and spreadsheets today. Maintenance products exist, some with free plans, and can be live in weeks.
  • You want sensors and predictions, or a catalogue of millions of spare parts. A product has more than we would build.
  • Your system would do the job if people filled it in, and a shorter form would fix that. Try that first.

Talk to us if

  • You keep your maintenance system or ERP, and the gap is between the first message and a complete order.
  • The right machine, the usual parts and the stock answer sit in your own records, and someone still walks to find out.
  • You want one thing built for one equipment type, at a fixed price, measured on your own breakdowns.

We do not build a maintenance system. If you need one, buy one.

How we start

One equipment type. One system. Measured on your breakdowns.

  1. First

    A free 30-minute call

    Bring five breakdowns from last month: the first message, the order as it was closed, the parts that were issued. Show them on your screen. No files come to us.

  2. Then

    A fixed price

    For a first version on one equipment type and one maintenance system or ERP, once we have looked at a sample of your closed orders.

  3. Build

    Reading, checking, a review screen

    A message or a note becomes a draft order with the machine, the fault and the parts. Your people review what the system holds before anything enters your system.

  4. Replay

    Tested on your closed orders

    We replay 100 of your closed orders and count: how many drafts came out complete, how many were held for a person, how many were wrong.

  5. After

    You decide

    Another equipment type, more sites. Or stop. You have paid for the first version only, and the code is yours.

From you: closed orders for one equipment type (an export is enough), your machine list, your parts list with bins and stock, a test copy of your system, and some time from the planner and the storeroom keeper. No test copy? We start from an export and connect later.

Closest work

What we have built that is close.

Plainly: turning fault messages and technician notes into work orders for industrial equipment would be new for us. We have not built a maintenance system for a client. That is why the first version is measured on your breakdowns.

You own the code, in your repositories. No lock-in, and no licensing per user.

FAQ

Common questions.

Bring your last five breakdowns.

A free 30-minute call. The first message, the order as it was closed, the parts that were issued. We go through them with you, on your screen.